How to Create and Approve Solar Sites in CrmLeaf

Solar CRM edition. The Construction CRM edition has its own equivalent construction site records. The vertical is a paid add-on module that an Administrator must enable for your account.

Availability: Solar CRM edition. The Construction CRM edition has its own equivalent construction site records. The vertical is a paid add-on module that an Administrator must enable for your account.

Overview

A solar site is the physical location you are going to install on, and it is the record every later stage of the solar flow hangs from. Onboarding a site captures how the array will be mounted, how the property connects to the utility, what meter is present and who owns the property. Sites go through an approval step and keep an audit trail, so you can see how a site record reached its current state.

How It Works

A site is created against a lead or a client, given its physical and electrical attributes, then submitted for approval. Once approved, it can be surveyed and assessed, and it becomes the anchor for the estimate, the installation project, the payment schedule and the maintenance schedule.

Create site Record attributes Approve or reject Survey Assessment

  • Site onboarding writes to an audit trail, so changes to the record are traceable.
  • The site's approval status controls whether the site is treated as confirmed for downstream work.
  • A site survey is recorded against the site, and an assessment then links the lead, the site, the survey and the assessor.
  • Sites can be the source document for a goods return, so material sent to a site can be returned against it.
  • Solar site approval screens are also available in the mobile app for field users.

Who Can Use This Feature?

Administrator

  • Configure the roof and installation types the site form offers.
  • Approve or Reject a submitted site.
  • Set which roles can see which site records through ownership-based permissions.

User

  • Create a site against a lead or client and record its attributes.
  • Update site details as more is learned about the property.
  • Open the site to reach its survey, assessment and installation records.

Access depends on the modules and role assigned by your Administrator.

Prerequisites

  • Solar master data configured, in particular roof and installation types. See How to Configure Solar Master Data.
  • A lead contact or client record for the customer who owns the property.
  • The property's utility connection and meter details.

For Users

Step 1: Open the solar sites screen

The list shows the sites you are permitted to see. Use Search and Filter to find an existing site before creating a duplicate.

Step 2: Create the site

Select Add and link the site to the customer's lead or client record. Enter the site's location and identifying details, then complete every mandatory field.

Step 3: Record how the array will be mounted

Set the installation type to roof, ground or tin, and select the roof type where the installation type is a roof. This drives the design work in the assessment.

Step 4: Record the electrical and ownership details

Enter the utility connection details, the meter type and the ownership of the property. Ownership matters because it affects who must authorise the installation and which subsidy schemes the customer may qualify for.

Step 5: Submit the site and Save

Save the site. It is recorded with an approval status so an Administrator can review it.

For Administrators

Step 1: Review the submitted site

What to do: Open the site and check the installation type, utility connection, meter type and ownership against what the customer told you.

What to verify: The audit trail shows who created and changed the record.

Step 2: Approve or reject the site

What to do: Select Approve if the record is correct, or Reject if it needs rework. The site's approval status updates.

What to verify: The approval status is visible on the site and the site can be surveyed.

Field and Option Reference

Field / OptionDescriptionRequired
CustomerThe lead contact or client the site belongs to.Yes
Installation typeHow the array is mounted: roof, ground or tin.Yes
Roof typeThe roof construction, selected from solar master data.Yes for roof installations
Utility connectionHow the property connects to the electricity network.Yes
Meter typeThe meter present at the property.Yes
OwnershipWho owns the property being installed on.Yes
Approval statusWhether the site record has been approved or rejected.Set by approval

Expected Result

The solar site is saved against the customer with its installation, utility, meter and ownership details, carries an approval status, and is ready for a site survey.

Important Notes

  • Menu names and their position can differ between product editions and can be customised for your account, so your sidebar may not match these paths exactly. Use Search or your Quick Access items if you cannot find a screen.
  • Site visibility follows the ownership-based permission scopes none / owned / added / both / all, so a field user may see only their own sites.
  • The same underlying screens serve the Construction CRM edition, where the record is a construction site with its own attribute vocabulary.
  • Get the installation type and roof type right at this stage. Both feed the assessment design and the BOQ that follows it.

Common Scenarios

Example: a tenant-occupied rooftop. The surveyor records installation type roof, the correct roof type, and an ownership value showing the occupier is not the owner. The Administrator holds approval until the owner's authorisation is on file, so no survey or estimate work is done on a site that cannot proceed.

Troubleshooting

IssuePossible CauseResolution
The roof type list is empty or incompleteSolar master data has not been configuredAsk an Administrator to configure roof types first
A survey cannot be added to a siteThe site is not approved, or the user lacks permission on surveysApprove the site and check the user's permission scope
A user cannot see a colleague's siteTheir permission scope is ownedChange the scope for the role to both or all
The site cannot be savedA mandatory field is incompleteComplete every mandatory field, then Save

Frequently Asked Questions

Can one customer have several sites?

Yes. Each physical location is its own site record, and each site carries its own surveys, assessments and installation work.

Who can approve a site?

Approval is an Administrator duty. The approval status and the audit trail record the outcome.

Can a site be approved from the mobile app?

The mobile app carries solar site-survey and approval screens for field users, gated by the account's product type.

What happens to a rejected site?

Its approval status shows the rejection so the record can be corrected and resubmitted rather than duplicated.

Still need a hand?

Our support team answers on business days. Reference SOL-03 so we can jump straight in.