SOL-05Industry / SolutionUser

How to Record a Solar Assessment in CrmLeaf

Solar CRM edition. The same underlying screen is labelled Solar Assessment in this edition and Construction Assessment in the Construction CRM edition. The vertical is a paid add-on module that an…

Availability: Solar CRM edition. The same underlying screen is labelled Solar Assessment in this edition and Construction Assessment in the Construction CRM edition. The vertical is a paid add-on module that an Administrator must enable for your account.

Overview

A solar assessment is the design record for a site. It takes the survey findings and turns them into the system design: how the installation will connect to the grid, what inverter arrangement is needed, whether batteries are included, and whether the customer is expected to qualify for a subsidy. The assessment is the document the estimate and BOQ are built from.

How It Works

Each assessment links four things together: the lead the enquiry came from, the site being installed on, the survey the design is based on, and the assessor who produced it. Against that context you record the grid type, the inverter type, and the battery and subsidy flags. Once the assessment is settled, it feeds the numbered estimate and the BOQ.

Link lead, site & survey Assign assessor Design grid, inverter & battery Flag subsidy Estimate & BOQ

  • Grid type is recorded as on, off or hybrid, which determines the rest of the design.
  • The inverter type is recorded on the assessment, along with flags for battery inclusion and subsidy applicability.
  • The assessment carries its own status, so an in-progress design is distinguishable from a settled one.
  • The estimate and the BOQ that follow are built from the assessment, and the BOQ is then handed to the Purchase and Manufacture modules.

Who Can Use This Feature?

User

  • Create an assessment against a lead, site and survey.
  • Record the grid type, inverter type and the battery and subsidy flags.
  • Update the assessment status as the design is settled.
  • Move from a settled assessment to the estimate and BOQ.

Access depends on the modules and role assigned by your Administrator.

Prerequisites

For Users

Step 1: Open the solar assessments screen

The list shows the assessments you are permitted to see.

Step 2: Create the assessment and set its context

Select Add, then choose the lead, the solar site and the survey the design is based on, and Assign the assessor. All four links are what make the design traceable back to what was seen on site.

Step 3: Record the grid design

Set the grid type to on, off or hybrid. On-grid systems export to the utility, off-grid systems do not, and hybrid systems do both.

Step 4: Record the inverter and battery design

Select the inverter type and set the battery flag according to whether storage is included. An off-grid or hybrid design normally implies storage, so check the two entries agree.

Step 5: Flag subsidy applicability

Set the subsidy flag if the customer is expected to qualify. Eligibility itself is evaluated against the subsidy schemes an Administrator configures. See How to Configure Financing and Subsidy Schemes.

Step 6: Settle the assessment and Save

Update the assessment status to show the design is settled, then save. You can now build the estimate and the BOQ from it.

Field and Option Reference

Field / OptionValues or descriptionRequired
LeadThe enquiry the assessment belongs to.Yes
Solar siteThe site being designed for.Yes
SurveyThe site survey the design is based on.Yes
AssessorThe user responsible for the design.Yes
Grid typeon, off, hybridYes
Inverter typeThe inverter arrangement chosen for the system.Yes
Battery flagWhether battery storage is part of the design.Yes
Subsidy flagWhether a subsidy is expected to apply.No
StatusThe stage the assessment has reached.Yes

Expected Result

The assessment is saved with its lead, site, survey and assessor, records the grid, inverter and battery design and the subsidy flag, and can be used as the basis of a solar estimate and BOQ.

Important Notes

  • Menu names and their position can differ between product editions and can be customised for your account, so your sidebar may not match these paths exactly. Use Search or your Quick Access items if you cannot find a screen.
  • The same screen is labelled Construction Assessment in the Construction CRM edition, so search material written for one edition may use the other name.
  • Record the design on the assessment rather than only in the estimate. The BOQ, the installation project and the budget all read from the same design decision.
  • A survey with a not feasible result should not normally lead to an assessment. Resolve the finding first.

Common Scenarios

Example: a hybrid system with storage. A customer wants backup during outages. The assessor sets grid type hybrid, selects the matching inverter type and sets the battery flag, then flags subsidy because the customer's ownership and system size fit a scheme. The estimate and BOQ then include the battery and the hybrid inverter without anyone re-deciding the design.

Troubleshooting

IssuePossible CauseResolution
The survey cannot be selectedThe survey is still a draft, or it belongs to another siteComplete the survey against the correct site
The inverter type list is emptySolar master data has not been configuredAsk an Administrator to configure the relevant solar master data
The estimate does not reflect the designThe estimate was created independently of the assessmentBuild the estimate from the settled assessment
A user cannot open an assessmentTheir permission scope on the record is none or ownedAsk an Administrator to adjust the scope for the role

Frequently Asked Questions

Can one site have several assessments?

Yes. A revised design is recorded as its own assessment, referencing the survey it is based on.

Does the subsidy flag calculate the subsidy amount?

The flag records that a subsidy is expected. Subsidy schemes and their eligibility rules are configured separately by an Administrator.

Who should be the assessor?

The user responsible for the design. Recording it keeps the design decision attributable.

Still need a hand?

Our support team answers on business days. Reference SOL-05 so we can jump straight in.