A managed service provider (MSP) earns money from two kinds of work. One is a fixed monthly fee for covered services. The other is extra work billed by the hour. Tickets are where those two meet. If a ticket is not linked to the right contract, the work is either billed twice or not billed at all.
The terms you need
- Ticket: a record of a request or incident from a customer, with its own time entries.
- Contract line: the agreed service and price for a customer, such as per-device support.
- SLA (service level agreement): the promised response and resolution times for a service.
- Response time: how fast the MSP starts work after a ticket opens. Resolution time: how fast the issue is fixed. The two are separate SLA terms.
Step 1: Link the ticket to a contract
When a ticket opens, the customer and the contract line should be set. Without that link, the system cannot tell whether the work is covered. Make this a required field, so no ticket starts without it.
Step 2: Log, approve and bill
Technicians log time against the ticket, not on a general timesheet. A manager approves the entries, or an agreed rule approves routine entries. Approved time then flows to billing under the contract type of the line.
The four contract types
- Per device: a fixed monthly fee for each covered endpoint, such as a laptop or server.
- Per user: a fixed monthly fee for each covered person.
- Block hours: a prepaid pool of hours drawn down by tickets, similar to a retainer.
- Time and materials: billed by the hour for each ticket outside the covered scope.
A worked example
A customer has a per-device contract with 40 covered endpoints at 25 per device per month. The fixed fee is 40 × 25 = 1,000 per month.
In one month, a technician works 1.5 hours on a printer that is not covered. The rate for uncovered work is 150 per hour. The charge is 1.5 × 150 = 225, billed time and materials.
The invoice has two lines: 1,000 for covered devices and 225 for the uncovered ticket. Each line traces to a contract term, which is what makes the invoice easy to defend.
Step 3: Check the billing run
Before invoices go out, check that each billable line traces to a ticket and a contract term. Look for three problems: tickets with no contract, time logged to the wrong customer, and covered work billed as extra. Fix these before the run is final.
Test before you buy IT PSA software
- Open a ticket for a covered customer and check that the contract line is set by default.
- Log time on that ticket, approve it and generate one invoice. Check the lines against the ticket.
- Open a ticket for an uncovered issue and check that it bills as time and materials.
- Record a response-time breach and check that the SLA report shows it.
For vendor pricing and options in this market, see the alternatives pages for HaloPSA and ConnectWise with Autotask. Their published price signals are estimates. Get a formal quote for your technician count before you decide.
Common causes of billing errors
Most billing errors in MSPs come from three places. The first is a ticket opened without a contract link, so covered work is billed as extra. The second is time logged to a general code instead of the ticket, so the work cannot be traced. The third is a contract changed mid-month without an update to the billing rules, so the old price stays in place.
Review these three points at each billing run. A short list of exceptions, checked by one person, catches most errors before the customer sees them.