CrmLeaf
← All guides

Operations and finance

How to set a billable rate for consultants: A Step-by-Step Guide

Set a billable rate that covers cost and leaves profit. Use this formula, the worked example and the checks to run before you publish a rate card.

7 min read · Updated 2026-10-30 · CrmLeaf team

A billable rate is the price you charge a client for one hour of a person's work. Set it too low and the work loses money. Set it too high and you lose deals. The method below gives you a number you can defend, because every input is written down.

The terms you need

  • Yearly cost: salary plus the share of overhead that belongs to this person. Overhead covers office, software, insurance and admin time.
  • Cost per billable hour: yearly cost divided by billable hours. This is the minimum you can charge without losing money on the person.
  • Target margin: the share of revenue you want left after cost. A 25% margin means 25 cents of every dollar of revenue is profit.
  • Effective hourly rate: revenue divided by all hours worked, including non-billable hours. It is always lower than the billable rate, because it counts time you did not bill.

Step 1: Add up the yearly cost

Start with the salary. Add the overhead you allocate to this person. A simple way is to divide the company's yearly overhead by the number of people, then add that share. Use the same method for every role, so the rates are comparable.

Step 2: Count the billable hours

Start with the hours in a working year. Remove public holidays, leave and training. The result is available hours. Then apply a utilization target, which is the share of available hours that you expect to bill. Billable hours = available hours × utilization target.

Step 3: Calculate the rate

Revenue needed = yearly cost ÷ (1 − target margin). Billable rate = revenue needed ÷ billable hours. Round up to a number you can publish.

A worked example

Take one consultant with a salary of 90,000 and an overhead share of 30,000. The yearly cost is 120,000. Assume 1,800 available hours and a 70% utilization target. Billable hours = 1,800 × 0.70 = 1,260.

Set a target margin of 25%. Revenue needed = 120,000 ÷ (1 − 0.25) = 160,000. Billable rate = 160,000 ÷ 1,260 = 126.98, which you round up to 127 per hour.

Check the result. At 127 per hour, 1,260 billable hours bring in 160,020. The margin is (160,020 − 120,000) ÷ 160,020 = 25.0%. The numbers match the target.

Now look at the effective rate. If this consultant works 1,800 hours in the year, effective hourly rate = 160,000 ÷ 1,800 = 88.89. That is the figure to compare with your cost per hour when you look at the whole year, not only the billed hours.

Common mistakes

  • Using 100% utilization. No one bills every hour. Start with a target that matches your past data, then review it each year.
  • Leaving out overhead. A rate based only on salary hides the real cost of each person.
  • Using one rate for every role. A senior consultant and a junior analyst have different costs and different value. Build a rate card by role.
  • Setting the rate once and never checking it. Review the rate after each pay change, and after each year of actual utilization.

Build a rate card

Run the three steps for each role, not each person. Then publish the rate card to the team and to the account leads. When a new hire joins, use the same steps, with their salary, to set the new role's rate. Keep the card in one place so each proposal uses the same numbers.

Next step

Use the project margin calculator to test a rate against a real project budget. If a project's margin falls below your target, review the scope before you change the rate.

Frequently asked questions

There is no single good rate. The right rate comes from your own costs, hours and margin target. Use the three steps in this guide, then compare the result with the rates your clients accept.

The billable rate is what you charge per billed hour. The effective hourly rate is total revenue divided by all hours worked, so it is usually lower.

Review them once a year, and after any change to salary, overhead or utilization. A rate set two years ago may not cover today's costs.

Keep reading